Updates 18-22 December

Hello team, the working week has ended, and during that week the following cases were resolved: 1. Logs were successfully moved Mongo database to our server. These are really good news, as this move helps to save good amount of expenses. From now on, all logs will be stored on our server. 2. Creation of new admin panel for offline stores! This week an important process started - as we may need more and more data related to offline stores, we decided to move that data to new admin panel, which will be responsible for offline stores data visualization. At present moment the following points were accomplished: Initial setup of process. Offline stores admin panel is a separated block (or component), which if needed can work with any other API available; Design of new admin panel will work great in latest modern browsers, but on most devices: mobile phones, tablets, desktops; At present moment admin panel will visualize orders done by customers + specific gathered information ...

Updates 11-15 December

Hello team, the working week has come to the end, and during that week the following cases were resolved: Recommended products just got better! Last time recommended products were done with grouping per category. And what if we start grouping recommended products not by category, but via purchased products. This approach benefits in one really important point - user can easily understand WHY these products are shown to him. Example: you bought this t-shirt, here we offer you other good products. Video overview below: Applied email template for recommended products. From now on, we are able to send to customers emails with recommended products! Email template is shown below, via 2 images: And here is bottom: Reduced price for MongDB usage. Note: this features should become available today. Last week MongoDB optimizations were performed, as result from today on, 2 major updates will happen: Paid mongoLab service will not be used anymore; All previous logs wil...

Updates 4-8 December

Hello team! The working week is over, and we are glad to share following updates that were done. 1. Fixes/enhancements for new email templates for redesign stage III As you may know, recent weeks we devoted really a lot of time on Stage II and stage III roll out, enhancements. During this week we continued to merge unmerged yet updates, and it figured out that email templates were not yet merged. While tests following fixes were done: Spelling fixes were applied; Fixes for email layout were applied; Previous developer didn't finish templates to the end, so Dima had to be keen on making code work as needed. Good news are current email templates are fixed and OK now, and tomorrow we roll them live! And that means more care about customers! Some screenshots: 2. Recommended products update - group products per categories. After products recommendations were generated, it is important to make user better navigate between them. For that grouping via category was appli...

Updates 27th November - 1st December

Hello team, the working week has ended, and I am glad to share with you following good things we done: Recommended products first results! Great news are that developer has finished first development period related to recommended products. That iteration required following: Generate list of recommended products based on purchased products before; Filter generated products based on category, sex, stock; Show recommended products to customer, when he enters CP page This which will be done this week: Show default recommended products to users when generated 0 recommended, as example - user did 0 confirm purchases; Cron job which will define recommended products once per day; Apply some separation of filtered products (probably based on category); Video overview: Export offline store registers! This was quick fix, which can greatly help Ale. Export of offline registrations can be gained at orders/actions tab. Please review video overview: For all of you, have a...

Updates 20-24 November 2017

Hello team. The working week has ended, and during this week we have been working on following features: Implemented first variant of product recommendations service The news are really good! At present moment system can generate us a list of recommended products based on input of product ID. Key features: Searches and counts all purchased with initial product products; Filters results based on parameters of stock, set, category; You can try it here:  http://23.21.45.209/admin/delivery_info/testRecomenedProducts?productId=57228 Short video overview: Gone live with filtering products of campaign on mobile devices! These news are positive, as from now on customers will be able to perform better products search! Please refer to video overview: For all of you, have a great time!

Updates 13-17 November

Hello team, the working week has ended, and during that week we have applied following updates to CP project: Successfully rolled out re-design stage III  to COM server. These are really great news, and I am very happy we have managed to do that step forward. Key features implemented: New #privacypolicy page; New #about page; New #faq page, now with categories! Also there is possibility to edit categories from admin panel; New #contactanos page; New #returnpolicy page; New #shipping page; New #suppliers page. Short video overview: Decreased costs for server rent This week was hard in terms of server prices optimization. The main goal was to chive RI implementation, but unfortunately that was turned out to be really complex. So after re-considerations the following approach was implemented: We had server and DB running on 2 instances. From now on they both run on one instance, so prices will go down as instead of 2 instance...

Updates 30 October - 3d November

Hello team. The working week has ended, and we have following points to review: We have accomplished redesign stage III I am extremely happy to announce that all last changes were applied to stage III testing fixes + enhancements, and final variant can be tried out at  http://dev.clubpoint.com/ Last changes that were applied: WYSIWYG editor was enhanced, images alignment is now supported; Modal window with loader on static pages changes. That really helps in terms of UI; Other minor defects were fixed, reported by Vika here . Video overview: We have accomplished following fixes related to Feedbackd on stage II Payment method, translate text, make checkbox visible; Telephone input, set limit 20 digits only max; Translate and correct texts TODAS LAS OEDENES ORDERNES ABIETRAS; For devolution and change, add reason: Not received; Add tracking number; The order number is not registered immediately, it would be good to show it in this step as follows; Return...

Updates 23-27 October

Hello team, we had really productive week, and I am happy to announce following updates: 1. Re-design stage III is accomplished! Yes, these are really great news! The following changes were applied: Page "Contactanos" was modified in accordance to designs; Page "Provedorees" was modified in accordance to designs; Fully re-done Ayuda page, now we have sections, and quick links!; All other static pages related to footer were changed. Please refer to video overview which may help you: 2. We made really great progress on point related to zNube reporting. Great news mean following enhancements that were applied: gMail API was successfully integrated; API authorization was performed; Implemented functionalist to get email from certain address; Done possibility to extract from email attachment; Done possibility parse attachment; At moment in progress save data from CSV file. That are great news, as this means we are able receive and save data fr...

Updates 16-20 October

Hello team! We had really great week, and have managed to accomplish following points: We almost finsihed CLUB-1168! I am really happy to announce on progress on Ayuda chapter. Items acoomplished: New layout of Ayuda page for Club Point; New layout of Ayuda page for mobile version Club Point; Possibility to bind article to 1+ category; Possibility to bind article to 1+ site, meaning clones like fullcamperas or donjuanonline; Possibility to delete article; Possibility to add article. Things to enhance: We need review/enhance WYSIWYG editor features; Allow administrator upload images to article; Save article bug; After missing features and bugs fixes we can roll it out! Please see video overview: We finished CLUB-1169! These are really amazing news, all email templates were successfully implemented! Some proves below:  If everything goes OK, next week we roll those changes out! Great news! As you can see, altogether with provedores an...

Updates 9-13 October

Hello team, during last week we have improved in following points: 1.We put max effort on re-design stage III At present moment the following updates have been implemented: We have finished CLUB-1154, Provedores page redesign. Result can be viewed at http://cptest.tk; We have finished CLUB-1162, Contact us page redesign. Result can be viewed at http://cptest.tk; In progress is task CLUB-1168, Ayuda chapter new features. next week I present result based on this task; In progress emails re-designs for Club Point project; When 2 in progress issues accomplished. we are really close to finish stage III; Current result you can view at cptest.tk 2.We enhanced re-design stage II based on feedback from CP team. The following points have been successfully resolved: Information: Be able to edit if you click in any part of the field. Green confirmation message: Change instead of ¨las marcas favoritas de salvado¨ put ¨Tu información se ha guardado¨ We are...

Updates 2-6 October 2017

Hello team, the working week is over, and during this week we have been working on following issues: We did good progress on re-design stage III: CLUB-1154 and CLUB-1162 Although that task is still in progress, I am glad that we have accomplished following issues: Contact us page functionality is fully accomplished and is ready for tests; Provedores page is completed by 80%: all code is done, only CSS styles are left to be added. Short video overview: Stage II last new revealed fixes were done, tomorrow we plan roll it out! Please review last changes that were applied, and if all OK, tomorrow we will roll it out! Amazing news. Video: Other fixes: CLUB-1114 done and ready for uplaoad; CLUB-1115 done and needs review. For all of you, have a great day!

Updates 25-29 September

Hello, during last week we have been working on following features: 1. We accomplished CLUB-1114 The following features were implemented or enhanced in terms of task: User is able to select OFFICE pickup point - Palermo or La paternal; Possibility to export orders with OFFICE pickup delivery type; Possibility to import file with OFFICE pickup parcels in order to update product status; Email when product is ready to be taken by user; Email when delivery dates have passed and product is still not ready to be taken by user; Product statuses. At present moment following statuses are supported: Listo en Deposito SN Listo para retirar Entregado All those new features you can try yourself at  http://cptest.tk/ Short video overview with latest updates is below: 2. We accomplished CLUB-1115 Great news are we were able to create a SUCURSAL parcel for Urbano! We never did it before, and it was really a great experience to accomplish that feature. Please find revi...

Updates 18-22 September

Hello team! We are glad to announce the following updates we have been working on during this week. Max effort on case CLUB-1114 This week we put maximum efforts on task Retirement in office. At present moment the following features are accomplished: Finished front-end part, where user of Club Point has possibility to select sub-type of office delivery. Selected sub-type is being successfully saved; Possibility to export all orders that have office delivery type; Possibility to import orders in order to update statuses; Updating order data ids statuses when correct import was done. Video overview: Stareted task CLUB-1153 It is really important to go live with stage II of redesign, and to accomplish a new challenge, Re-design STAGE III. For this week only some hours were devoted to this task (it was case CLUB-1154), but good news are if all ok, next week we put much more effort on it. Applied changes to offline registrations, based on CP feedback ...

Updates 11-15 September

Hello team, the working week has been ended, and during this week we have been working on following features. Major fixes related to re-design stage II were done. Delivery date was not showing OK. Fixed; Put text "Listo para preparar" if no product status. Fixed; Remove size/color/quantity, leave only product title; GREEN button "transferencia a realizar" fix; Send email when cambios + user has to pay difference. All fixes found by Vika (available at https://docs.google.com/document/d/1B9TtQDM-afucVB_iJjE4V7_aKqpt6SH5jZRPUOxjWwc/edit?usp=sharing ) were fixed. Final version will be switched Monday at http://dev.clubpoint.com. We are ready to roll it out! We did incredible progress related to offline registration The following enhancements and features were applied: From now we can pass ID of shop in URL; If ID of shop is not specified, redirect to authorization page; Simplified purchased products flow; Redirect to adding purchase page after regi...

Updates 4-8 of September

Hello dear CP team, greetings from Ukraine. During this week we have been working on following issues. 1. We are close to accomplishment of offline user registration! During this week we have been working hard on case of offline users registration, and at present moment the following features are done: It is possible to register a new user by entering following data: email, phone number, name, surname; Each offline shop can view only it's registered users; Administrator can add a new order for any user registered in shop; Each order can contain any quantity of products; Colors and sizes are taken from CP database, and that makes our app really amazing and flexible. Short video overview: 2. We successfully resolved CLUB-1133 For the recent few weeks we had a severe defect, when Google E-commerce Analytics was not performing. That case happened after we rolled out Google Merchant integration. Luckily, yesterday we made it work OK, so from that time on all returned...

Updates 28 August - 1st September

Hello team, the working week has ended, and we have accomplished following issues: We finished CLUB-1101 - retiro sn We managed to accomplish all changes mentioned in task, and now email user receives looks really more informative and easy to understand: We finished with all fixes for Don Juan Project! These are really great news, that we have new project ready to go live! Let's review DJ together: We have finished other important tasks: We started OFFLINE users registration task, the important one which will help both administrators and customers at CP shops: Customers will have possibility to register offline and get bonuses; Administrators of CP shops will have possibility to record users purchases. We finished CLUB-1131, Correct product status 4 (COM) We finished CLUB-1114, Retirement in office. Task is currently on tests. For all of you, have a great time.

Updates 21-25 August

Hello team, the working week has ended, and I am glad to share with you latest updates and features we have been working on. 1. We rolled our Club Point and Don Juan Online. This week we did really important shift in our projects development: We finished developement of Don Juan Online and rolled it out. For now it is hidden with password at http://donjuanonline.com We rolled out Club Point with NEW HTML-structure of files. Thanks to same structure of both Club Point and Don Juan Online we will be able to do new features/fixes to both projects without any pain; At present moment we are doing one more stage of design changes (CSS only related), which we will roll out next days, so be ready to put hands on nice testing! 2. Other important tasks we have accomplished We accomplished CLUB-1129, Correct product status 3 Accomplished CLUB-1128, Correct product status 2 Finished CLUB-1127, Correct product status + condition For all of you, have a great day! ...

Updates 14-19 August

Hello team, during last week we have been working on following issues: 1. We finished r unning new cycles of tests for CP and DJ with objective of having both projects ready to be switched by end of week. Task was successfully accomplished. We run projects tests, checked emails, checked mobile versions of projects. I encourage you to try them yourself at  http://cptest.tk/ and  http://cptest.tk/donjuan 2. We finished CLUB-1115 Task named  IMPLEMENT RETIREMENT IN URBAN BRANCH was accomplished. Video overview: 3. Finsihed CLUB-1121 "Delete club point stock (arg)" was successfully resolved and gone live. See image for details: Other tasks accomplished: CLUB-1120 (Cron that chercks load to project, fix for deploy) CLUB-1092 (Chat Zendesk (dev com)) Have a great day!

Updates 7-11 of August

Hello team, during this week we have been working on following cases: 1. We finished 2 cycles of tests for both Club Point redesigned and Don Juan Online. I should admit that during this week all were maximally concentrated on having as much done as possible for redesigned projects Club Point and Don Juan online. It total amount about 15+ defects were fixed by developer. Latest updated versions can be obtained at: Club Point -  http://dev.clubpoint.com/ Don Juan Online -  http://cptest.tk/ Please see video overview of updated version: 2. We have been working on moving Club Point to smaller instance. During this week we did following actions: We moved CP to nano instance type. When we have max load period (9-10 morning ARG time zone), we had server done. We did our best to return it back asap. Downtime was few minutes, these are good news. After that case CP was moved to small instance, which is more powerful. Unfortunately after some time we Pamela reported ...

Updates 31 July - 4 August

Hello team! We had really great week, and I want to share with you our latest progress. 1. We accomplished implementation of Don Juan online and Club Point based on SAME SEMANTICAL STRUCTURE! I beleive this short poster can explain more details on what problem we were trying to resolve: Other key notes we need to mention: At present moment OLD and NEW Club Point redesigns are VERY different, and maintaining 2 different projects would mean doing same feature twice: for old and for new design. Thanks to same structure for both projects, this huge problem is resolved. New structure Club Point can be reached at  http://dev.clubpoint.com/ I encourage you try it out! Don Juan Online can be accessed at  http://cptest.tk/ Good news related to Don Juan online, it has enabled feature of discount based on quantity of products user is buying - 5%, 10% and so on. Try add big amount of products (20-30 items), and you will see discount will appear in cart page. Current versi...

Updates 24-28 July

Hello team. Great news we bring to you at the end of this week. 1. We finished redesign of cambios process! Please watch this video overview! 2. We finished redesign of devolucion process! Please watch this video overview! 3. We finished redesign of redespacho process! Please watch this video overview! 4. We finished redesign of order details process! Please watch this video overview! 5. We made progress on Don Juan online project. Please refer to video below: WE HAD REALLY GREAT WEEK!

Updates 17-21 of July

Hello team, during this week we have been working on following issues: We accomplished re-design for pages cambios, devolucion. These are really cool news, as with these changes Club Point user will be able to have a better control over his parcel. Key features: Much nicer interface! Possibility to perform cambios request by choosing products to be exchanged; Possibility to pay under condition new amount is higher of amount of order; Track cambios status; Automatically gain credits when cambios was approved; Possibility to perform devolucion request from profile page; Track devolucion status from profile page; Mobile friendly interface. Please refer to video overview: We started Don Juan Online I am happy to announce that 50% of this week Dima was working on Don Juan Online implementation, and that soon we will show you brand new project. For now, some screenshots-appetizers: We have fixed all requirements from Google Merchants. This feature may be more mar...

Updates 10-14 July 2017

Hello tea,m, this week we have been working on following issues: Re-design of profile page for Club Point, cambios and devolution. Good news, we are really close to have cambios done. At present moment the following features are done: Select campaign for which we need apply cambios; Select product of campaign; Remove selected product. Things we need add: Send data to server, save cambios; Show on profile page status of cambios. Please refer to following video-overview: Related to devolucion, Dima will put max effort to finish it next week, as during this week we spent many time on defect fixes + one template for all mobile page edit. This is important feature done, as from now this design can be applied whenever we need it. For now we have such screen in cart, profile edit pages. This means we are not copying same code 4 times for each edit, but we use ONE code for all of them. This is important. We applied all required fixes in order to finish Goog...

Updates 3-7 July 2017

Hello team, this week we have been working on following items: We put max effort on re-design stage II We have done really great work. First of all, we defined first steps to be applied: Base view implementation; Layout creation: CSS, HTML; Filter - todos, abiertas; Display address of delivery; Display despachado date; Display status of each product (cambios, devolucion); Possibility change devolucion real money to credits if NOT confirmed by adminsitrator). Good news we have accomplished HTML/CSS layout! Take a look at these awesome screenshots: And that is look for mobile devices: We finished new delivery option, CLUB-1065 Please refer to video overview: This feature will be rolled our live Tuesday, so if you have any improvements, please let us know! For all of you, have a great time!

Updates 26-30 June

Hello team, during this week we have been working on following features: We have accomplished redesign of /profile page I am glad to share these news, we became one step closer to finish redesign. Some key features: Removed brands, and implemented possibility user to choose categories, not brands. This will help us have more visibility on things people like and choose; Edit user information was extremely enhanced. Now it is done via one component that will help better maintain it in the future; You can try it yourself at http://cptest.tk/#profile Remember to do authorization before entering profile page. Short video overview: We enhanced a lot dev com, redesing stage 1 I am glad to announce that we have finished with defects for stage 1 redesign. The following imporvements were integrated: Fixed for iOS devices: Add to cart, "Continuar" link was not working on specific iOS versions; Fix vendor prefixes for translate properties; Fixes for desktop ve...

Updates 19-23 June 2017

During this week we have been working on following features: Redesign of user's profile, we almost accomplished main profile page. Please review current results under different devices: Some key notes: We removed brands from profile. From now on, user will be able to select CATEGORIES, what is more logical enhancement. User will be able to edit profile data (name, email, password) more convenient way, as per each option a new screen will be loaded, what gives user much more space. 2. We have been working on enhancements for redesign stage 1. The following enhancements have been accomplished: All were accomplished from document https://docs.google.com/document/d/1_bZlqJIVxA9JXOcfz9Rgho0iYc8vAfGMWGjpoe9aIzU/edit All were accomplished from document https://docs.google.com/spreadsheets/d/1pqRy1UT3l0I2ObU6JEPbwlO0J_EqJhZQWAByI7DZA-0/edit?usp=sharing We applied new feature - set discount for campaign in CMS. Please see video:

CP updates 3-7 of April

Hello team. We had really productive week, we accomplished 2 but extremely important things we have been devoting time during whole week: 1. We have accomplished cart refactoring for CP projects. Video overview: Questions and answers: Is it done 100%? No, there still exist defects fixes for which will be provided during next week; Victoria did several cycles of tests and continues worry hard in order our update work perfect on different browsers and devices. Is it live? Yes, it is live on TEST server,   http://dev.clubpoint.com Can I try it? Yes, you can and we encourage you to try new cart yourself. If you find any defect, please let us know, and we will provide fix. When will it  be live? Firstly we will move it to COM, and if it is OK, we will move it after to CL. We expect to have it live on COM in nearest days. 2. We have accomplished profile refactoring for CP projects Video overview: Questions and answers: Is it live? Yes, it ...

Club Point updates 27-31 of March

Hello, team, this week we have been working hard on stage 0 of re-design, which is related to refactoring of cart and profile pages. Let's see results: 1. Accomplished desktop cart refactoring. Dima did really great job, and now we have NEW cart, which is: More optimized in terms of development; Has much faster load time; Before this important step developers were maintaining 2 codes - one old slow code, and new fast one. With new cart there will be LESS old code, and as result better maintenance possibilities. Video: 1. Accomplished profile refactoring, pages of credits and orders. Yura has accomplished 2 more important parts of refactoring, they are related to profile page, sections of orders and credits. Those parts helped us: One more step to move all functionality of CP to new faster executing code; Profile is loading much faster, better user experience; After profile and cart refactored we will be able to start with new designs. Video: For all of ...

Club Point updates 20-24 of March

Hello team. During this week we have been working on following features: We are close to accomplishment of important stage 0 of re-design. On this stage developers Dima and Yuri do refactoring of code related to profile and cart pages. Let's see progress related to profile pages:  Profile invitations page is fully ready and live on COM. If all OK, we will move it to CL; Profile orders page is 100% accomplished and is on stage of tests at http://cptest.tk; At present moment Yuri is working on credits page; When it is finished, he moves to main profile refactoring.  Please refer to video overview: At the same time Dima was working on cart refactoring, and here we have EXTREMELY good news: 2. Re-design stage 0, we accomplished new cart template I am happy to announce that we have accomplishment new template for cart. It is available here:  http://dennisradai.com/projects/clubpoint/html/cart.html  Video overview: For all of you, have a ...

Updates 13-22 of March 2017

Hello team, during week we have been working on following features: We accompished CLUB-886 (Set New Field: Estación in Product):  I am glad that we rolled out this feature. From now you can set following estaciones: Sin estacion; Media estacions; Verano; Invierno. Please see video for reference: We gone live with refactoring stage 0, part 1. We are happy to share with you really good news for us, as we are close to finishing part 0 of refactoring, Vika was testing hard and managed to roll out part of of stage 0. For now it is live on COM, and we are looking forward to move it also to CL after being sure we are OK with project's functionality. After we roll out next pieces, I will be happy to show you cart refactored fully live! We accomplished and gone live with CLUB-893 The following enhancement was done:"example: http://clubpoint.com/admin/orders/show/405384/ we sent through shipnow, from their options, we have to take delivery status from them"; ...

Updates 6th of March - 10th of March

Hello team, let us share with you latest updates about what we accomplished during this week! We started extremely important CLUB-925, Club Point re-design. This is our next important objective to be achieved during nearest months. If should be mentioned that re-design will consist of following stages, each stage will go live after finish: Stage 0. Preparational. Here we do required preparations  in order to start moving to new design: JavaScript refactoring of cart page, including for mobile devices; JavaScript refactoring of payment gateways related code; JavaScript refactoring of #profile page; JavaScript refactoring of #profile/orders page; JavaScript refactoring of #profile/invites page; JavaScript refactoring of #profile/credits page; Stage 1. Main flow re-designed: Apply HTML, CSS template for cart page of the project; Apply HTML, CSS template for cart step 2 page of the project; Apply HTML, CSS template for cart 500 page of the project; Apply HTML, ...

Updates 27of February - 3d of March

Hello team, we had really productive week, and I want to share with you latest updates we did: CLUB-893 is live Task named "Field in backend for Delivery Status" is 100% accomplished, tested and live. We do hope it will help you to perform better operations with our admin panel. Some screenshots for better understanding of new functionality: We applied important changes to upload products file: Those changes were received by us as improvements to current upload process and accomplished as Jira tasks CLUB-933 and CLUB-886 Add column "Estacion". Accomplished and live, for now we are pending one more improvement, which will allow only certain values. Please expect this feature for new iteration; Add column "Sync with ShipNow". This is really good enhancement that will give our CMS more flexibility; We accomplished new register flow.  These are really good news. For today we do final tests, and if all ok, we will try to switch it to LIVE pro...

Updates 20.02.2017 - 25.02.2017

Hello team! Our 3rd iteration is currently in progress, and I want to share with you our latest updates: We have applied fixes and enhancements for CLUB-907 I am glad to announce that we have accomplished first cycle of fixes and enhancements related to new registration flow. Please refer to video of what we had after development: Fixes we applied: New email template was applied; We accomplished all translations from English to Spanish; Added possibility to re-send email with confirmation link; Applied fix when FB login was not working OK in new register flow; Applied fix when after editing to same email address user was able to skip confirmation process; Currently we keep on tests. Approximate date of roll out this new feature: 3d of March. We accomplished CLUB-909 We have managed to move CL to cheaper server, which will help us to run project at lower cost.  We have accomplished CLUB-886 We are glad to announce that during week we ha...

Iteration #2 | Feb 7 - Feb 17 | 2017

Hello team, let us review all new features we have been working on during iteration #2. Accomplished CLUB-907: New registration flow for CP project. This was really important and not trivial task to accomplish. New flow will be applied for the following processes: user registration, registration via invites, change email address in profile of user. New flow image is following ( Click to open full image in new tab) Please see short video overview: We have gone live with extremely important task CLUB-876: Sync SN and CP flow This was epic task, and I am glad we did it. Please refer to full video review below: Gone live with CLUB-912: Export from filter Now administration of ClubPoint can export orders based on labels order or product have: Accomplished and are currently testing CLUB-906: Logs for mails related to orders We need provide our customers with a better service. To do so, we need be sure user has received emails when: ...